Route intervention before failure

I-40 storm cell and traffic backup - reroute before service failure.

Control Tower flags a weather and congestion packet ahead of a driver HOS exposure. Dispatch can reroute, update settlement proof expectations, and preserve service before the truck is late.

Total open risks5
Critical risks4
Dispatch blocking3
Manager action5

Finance Summary - Factoring Packets

Packet-to-cash status should be visible before the settlement desk starts chasing paper.

The old Command Center made finance feel operational. This version keeps that: ready packets, missing proof, held packets, and the document set that controls cash movement.

Factoring packets include invoice, rate confirmation, BOL, POD, seal verification, accessorial support, and settlement release notes.

Risks needing attention

Prioritized risk cards should explain what is blocked, why it matters, and what clears it.

CriticalDispatch: BlockedSettlement: HoldManager action required

Pre-trip asset defect blocks dispatch.

The assigned unit cannot be released until the defect is repaired, owner sign-off is recorded, and ELD sync proof is attached.

Affected entities

DRV-003 / TR-1931 / DRY VAN TRL-088-04

Business impact

Dispatch is blocked and settlement release is held until safety clears.

Action details

Owner: Safety lead. Due: today.

ReviewDispatch: At riskSettlement: HoldDocument owner assigned

POD renewal evidence needs review.

The packet can move only after corrected POD, receiver evidence, and renewal support are attached to the same load record.

Affected entities

BOF-1907 / Carlos Martinez / TR-2048

Business impact

Billing will inherit a weak packet unless the proof gap clears first.

Action details

Owner: Dispatcher / packet owner. Due: next review cycle.

ReviewCarrier gateInsurance warningManager action required

Carrier renewal evidence needs manager review.

Carrier assignment remains visible but controlled until renewal documents, insurance status, and dispatch impact are reconciled.

Affected entities

CAR-001 / Blue Ridge Overland / L011

Business impact

Carrier can support current work only if renewal documentation stays attached.

Action details

Owner: Manager review. Due: before release.