Pre-Trip Readiness Packet

Load BOF-1907 cannot release until the packet clears.

Route: Tulsa, OK to Kansas City, MO. Driver: Carlos Martinez. Tractor: TRK-104. Trailer: TRL-228. Scheduled departure: 6:30 AM.

Hold release status 2 items must clear 10 packet requirements
Open Dispatch Context

Readiness packet

Every row explains the requirement, status, issue, owner, and clearance action.

RequirementStatusIssueOwnerClearance Action
Rate confirmationReadySigned customer rate stored.Dispatch coordinator
BOL template and pickup instructionsReadyPickup notes and shipper contact are complete.Load planner
Driver assignmentReadyCarlos Martinez is assigned with route fit confirmed.Dispatch manager
Medical card renewalAttentionRenewal image is uploaded, but safety review is not complete.Safety lead
Tractor availabilityReadyTRK-104 inspection and maintenance release are current.Maintenance coordinator
Trailer availabilityReadyTRL-228 is empty, inspected, and matched to load type.Yard lead
Insurance and authorityReadyOperating authority and insurance record are current.Compliance owner
Customer proof standardAttentionReceiver requires dock photo plus signed POD; driver packet shows POD only.Billing owner
Policy acknowledgmentsReadyCargo securement and customer-site rules acknowledged.Policy owner
Settlement setupReadyPay basis, accessorial rule, and hold reason path are set.Settlement owner

After release

The same record follows in-route, delivery, billing, settlement, claims, and audit work.

01

In-route

Delay, detention, seal, customer change, or missing-proof issues keep owner and consequence visible.

02

Delivery/POD

Signed POD, receiver name, dock photo, timestamp, and exception notes attach to the load record.

03

Billing

Invoice support, accessorial evidence, missing proof, and customer proof rules are reviewed together.

04

Settlement

Pay-affecting proof, deductions, reimbursements, holds, and approvals remain tied to the same packet.

05

Claims

Damage notes, photos, customer messages, and retained proof support review without breaking the record.

06

Audit

The decision path preserves what was ready, what was held, who cleared it, and which evidence supported release.

Related BOF areas

Load readiness depends on dispatch, documents, settlements, safety, and policy governance.